Intuitive Machines-2

From Spacefaring

Revision as of 14:02, 30 August 2024 by John (talk | contribs) (Bot: Automated import of articles)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Q124545375




IM-2 was a lunar mission run by Intuitive Machines as part of NASA's Commercial Lunar Payload Services (CLPS) program. It was launched on 27 February 2025, at 00:16:30 UTC. The Nova-C lunar lander, named Athena, reached the surface of the Moon on 6 March 2025, at 17:28:50 UTC. Contact was temporarily lost during the landing process; when it was re-established, it indicated that the spacecraft was not in the correct orientation and one of the two radio antennas was not operating. The sideways orientation prevented the spacecraft from generating sufficient power. By 7 March, Athena's power had been fully depleted and was not expected to replenish, bringing the mission to its end.

WebsiteWikimediaWikidata
Nova-CSpaceXFalcon 9 Block 5


Location: -85, -31, KML, Cluster Map, Maps,
Loading map...
    2025-03-07T00:00:00Z
    2025-03-07T00:00:00Z
    mission termination
    2025-03-07T00:00:00Z
    2025-03-07T00:00:00Z
    loss of signal
    2025-03-06T00:00:00Z
    2025-03-06T00:00:00Z
    Moon landing
    2025-02-27T00:00:00Z
    2025-02-27T00:00:00Z
    rocket launch
    {"selectable":false,"showCurrentTime":false,"width":"100%","zoomMin":100000000000}
      TypeSubtypeDateDescriptionNotesSource